1/1 1918-1/6 1918
The planned upgrading of the army has been postponed for a year, since the funds
available hasn't been adequate apart from a minor upgrade of the fortress corps.
Also the scrapping of the two Ultor class Bb and the three old cruisers of the Ise
class is also being postponed apart from removing the main armament of the
Battleships and ready them for their future role as coastal defenses, which will
commence during the fall and for the rest during 1919.
1/6 1918-31/12 1918
The completion of the first 4 Corvettes in Esc, as being the first dedicated ASW
vessels in the navy, the exercises with these vessels is look upon with high
expectations, which will determine if further vessels will be commissioned in the
future.
A cooperative company made up by leading wharf owners in the Baltic area, has
worked together, and created a joint design bureau under the name of: Design
Bureau Hamburg that will try to gain international building orders, and also provide
designs for both foreign and domestic costumers.
The Krupp/Bofors Company has started the development of a 280 mm gun for the
use in a new class of Fleet cruisers and is also lining up for the development of a
455mm gun starting in the New Year. The plan is construct at least 3 455mm gun
for testing in 1921, when the gun is finished its development.
27/10 18
Myrwik
Flensburg
Esc naval Academy
A soft tab is heard on the door to Vize Adm. Lewenhaupts office, and in steps Felix
Dzerzhinsky.
Good evening, Felix, are you progressing with our latest affair?
Most certainly Vizeadmiral,it is progressing better than expected.
Do you really think they will fall for it?
I am quite convinced that we will succeed to the utmost, already now are we yielding some results and it is my firm belief that it will yield even further results in the coming year.
Then we better keep in the wraps for the time being.
At the same time a group of theoretical Physicist is gathering at the "Institute Des
Theoretisches Physic" is gathering in Berlin lead by Max Planck.