Welcome, Guest. Please login or register.
September 05, 2010, 10:17:33 pm
Home Help Login Register

+  www.navalism.org
|-+  The Sim
| |-+  Sim Reports
| | |-+  Romania 1918
« previous next »
Pages: [1] Print
Author Topic: Romania 1918  (Read 79 times)
TexanCowboy
Hero Member
*****
Posts: 1817


CITY SHATTERING KABOOM!


« on: February 07, 2010, 04:42:42 am »

Romania Half A 1919

Area         Population       BP   IC     Revenue
Romania      13.25            3     14.5   $27.75

PEACETIME BUDGET

Additional Revenue:
+$20C from New Switzerland for Classified Agreement
+$20.25C from Romanian Corruption

Total: $13.25 Military, $53.50 Civilian

Naval Operations:$3.55, 3 BP

A. Maintenance Operations: $.45

B.  Construction:$2.5, 2.5 BP
     Smavani, completed in April at Constanta,  all resources allocated
     Mastron, completed in June at Constanta, all resources allocated
     Nava, began in January at Constanta, floated in May, $2.19, 2.19 BP allocated 
     Marin, began in April at Constanta, $.81, .81 BP allocated

C. Refit and Repair:$.1
    James Watt, at Constanta, $.1, Entered in January, exited in March

Army Operations:$3.2

A. Maintenance: $3.20


Infastructure Developments: $5.50

Enlargement of Constanta to type 3 port ($11.75/$15)| (1 BP/ 1 BP)

Research: $1

1908 fire control (3/4)
1906 BB/AC (2/2)
1912 DD (2/2)
1898 Airships(1/2)


Civilian:$53

14.5th IC, $35 allocated as of January 1918, $40 allocated, completed

15th IC, $13 allocated, $24.5 remaining
« Last Edit: February 07, 2010, 05:04:56 am by TexanCowboy » Logged

"But sir, trying to hit a rocket with another rocket is like trying to hit a bullet with a smaller bullet blindfolded on horseback in hurricane force winds in the middle of a earthquake."
TexanCowboy
Hero Member
*****
Posts: 1817


CITY SHATTERING KABOOM!


« Reply #1 on: February 07, 2010, 05:05:53 am »

Romania Half B 1918

Area         Population       BP   IC     Revenue
Romania      13.25            3     14.5   $27.75

PEACETIME BUDGET

Additional Revenue:
+$20C from New Switzerland for Classified Agreement

Total: $13.88 Military, $37.88 Civilian

Naval Operations:$3.45, 3 BP

A. Maintenance Operations: $.45

B.  Construction:$3, 3 BP
     Nava, began in January at Constanta, floated in May, $2.81, 2.81 BP allocated, all resources allocated
     Marin, began in April at Constanta, $.19, .19 BP allocated


Army Operations:$3.2

A. Maintenance: $3.20


Infastructure Developments: $3.5
Enlargement of Constanta to type 3 port, $3.5 allocated, completed

Air Force: $3.3
3 airfields constructed:$3
50 multi-engined craft:$.2
100 single-engined craft:$.1


Research: $.75

1908 fire control (4/4)
1898 airships (2/2)
1900 underway refueling (1/2)

Civilian:$37.88

15th IC, $24.5 allocated, completed
16th IC, $17.5 allocated, $57.5 remaining

$.13 to Green Cross
Logged

"But sir, trying to hit a rocket with another rocket is like trying to hit a bullet with a smaller bullet blindfolded on horseback in hurricane force winds in the middle of a earthquake."
Pages: [1] Print 
« previous next »
Jump to:  


Login with username, password and session length

Powered by MySQL Powered by PHP Powered by SMF 1.1.11 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!